Thursday, May 2, 2019

Choose one fromTOTAL QUALITY MANAGEMENT or NEW PRODUCT OR NEW SERVICE Essay

Choose one fromTOTAL QUALITY MANAGEMENT or red-hot PRODUCT OR NEW SERVICE INTRODUCTION (NPI) orLEAN MANAGEMENT - Essay ExampleThe engine and the accessories atomic number 18 all out-sourced from about 80 suppliers. The engine supplier is located about 100 Km away but the accessory suppliers are scattered all over the country There is a paint shop but the play along uses a contractor to do the jobs with his own labour.2. There is either a deficit or senseless of raw visibles at Production Assembly Line as the company works on ground of Material Requirement Planning (MRP) and is dependant on supplier offering delivery dates3. Movement deep down the plant is slow and not smooth. Apart from the main conveyor Belt there are some conveyor belts and component feeding is mostly manual. There are only 3 forklift trucks, one for each(prenominal) Machine shop.As a result of above there are Erratic Dispatches. The dealers complain of absentminded delivery dates for their customers. De spite having fixed quotas for 50 dealerships the company is unable to forecast its requirements. This shows complete ignorance of how to use information and information for production planning.There is no consistency in Production plan. It is made weekly as per demand pressure without considering availableness of capacity or raw materials. The Material Requirement Planning (MRP) does not take into consideration the available capacity and schedules resulting in either excess raw materials or shortage of raw materials at production head and elsewhere. Resources are not adequately available for Production resulting in delays within the operationMany movements within same section and among sections are manual as there is a shortage fork-lift trucks. No attention has been paid to installation of conveyers within sections and adding more forklift trucks between sections. Despite the equipment being relatively new breakdowns occur due to non existence of Preventive Maintenance Plans and non availability of spares in timeSupply chain is not synchronized with Production hence raw material arrival does not match Production requirements. The

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.